BattleMeshV5 Tests

General Rules

Tests

The ZooBab Test

Be Quick or Be Stable Test

Convergence Time Test

To be performed on the whole mesh and repeated 3x for each protocol

Part 1

  1. traceroute from one end (node A) to the other (node B) of the mesh until the path is stable

  2. find a critical node N in the path so that

    1. has good quality links with its neighbors (possibly more than one)
    2. if shut down the network does not split
  3. start a ping from A to B

  4. turn off N

  5. count the number of pings from the first lost ping to the first subsequent successful ping

Part 2

  1. start a continuous traceroute (e.g. mtr) from node A to node B

  2. turn back on node N and start a stopwatch

  3. measure the time needed to get the node N (back) into the traceroute

Don't Cross the Streams Test

BattleMeshV5/Tests (last edited 2012-02-29 22:08:03 by Clauz)